Onward KARIKA, Plot# 02, Road# 01(Main Road), Block# A, Section# 13, Mirpur, Dhaka-1216. The Estimation of This Sixteen (B1+B2+G+13) Proposed Storied Commercial Building. Construction Duration is 48 Months And Handover Time Is December-2025. There Will be 14 Floor and 02 Parking Floor, Building Front: South. Total Land Area Is 10 Katha.
48 Months
December- 2025
14 (Proposed)
02 (Proposed)
10 Katha
South
B1+B2+G+13 (Proposed)