Commercial

ONWARDNABILA

House# 09, Road# 14, Block# SW(C), Gulshan Circle-1, Dhaka-1212.
Construction Duration: 60 Months
Hand Over: December 2026
No of Floor: 19
No of Parking Floor: 03
Land Area: 13 Katha
Building Front: West
Storied Of The Floor: B1+B2+B3+G+18

ONWARDHEIGHTS

217/3, Taltola, Begum Rokeya Sharani, Mirpur, Dhaka-1216.
Construction Duration: 60 Months
Hand Over: December 2026
No Of Floor: 14 (Proposed)
No Of Parking Floor: 02 (Proposed)
Land Area: 24 Katha
Building Front: West
Storied Of The Floor: B1+B2+G+13 (Proposed)

ONWARDKARIKA

Plot# 02, Road# 01(Main Road), Block# A, Section# 13, Mirpur, Dhaka-1216.
Construction Duration: 48 Months
Hand Over: December 2025
No Of Floor: 14 (Proposed)
No Of Parking Floor: 02 (Proposed)
Land Area: 10 Katha
Building Front: South
Storied Of The Floor: B1+B2+G+13 (Proposed)